Howe Sound P&P
- Upgraded digester consistency and level control
- Advanced control on washers
- Problem with B/S Kamyr Diffuser - rebuilt and broke twice since - broken nozzles
- New spring gate roll size press and internal sizing
- Upgrades to consistency control on TMP line
Irving Pulp, St. John, NB
- See notes from presentation
- Installing Kappa analyser
- Upgrades to digester in future
- Using cooling water to heat ClO2 in winter
James River-Marathon Ltd.
- 50 year anniversary of the mill start-up on October 15, 1996. The mill made 6,739,961 BADMT during that time. Record production in 1996 (171,041 BADMT)
- October 22/96: 430 days since last Lost Time Injury (900,000 man-hours)
- Secondary Treatment start-up in November 1995 (4.5 km from mill) 45% reduction in AOX
- Resources Alignment underway
- D1 Kajaani brightness probe relocation to 30 m. after ClO2 injection has eliminated filming over of the probe (Aug. 1996)
- Blow Tank Implosion (July 1996) after blew 3 digester in a line, plugged vent line, vacuum relief not working. New blow tank installed in 22
weeks.
- New Digester DCS System installed July 1996 (Fisher Provox)
- CO2 trial on B/S Washer was conducted in October 1996
- New Evaporators / Steam Stripping / Blow Heat Recovery upgrades Fall 1997
MacMillan Bloedel, Powell River
- Upgrades - Replaced hypo bleaching with new ClO2 stage
- Upgraded extraction stage washer
- Upgrade ClO2 plant
- New wet lap machine going into Port Alberni mill
- New bleached HD storage in January 1997
Malette, Smooth Rock Falls